Business Pain Point: A major power plant faced recurring misalignment issues in its steam turbine-generator set after each start-up and shutdown cycle. Investigation pinpointed the root cause: inconsistent preload in the massive foundation anchor bolts, allowing the multi-hundred-ton assembly to shift microscopically. This “creep” threatened catastrophic vibration, bearing damage, and unplanned outages, risking millions in lost revenue and repair costs.
Technical Challenge: The foundation bolts, some over 3 meters long, needed to maintain perfectly uniform clamping force despite constant thermal expansion and contraction of the entire structure. Traditional hydraulic tensioning was too slow and could not guarantee simultaneous, symmetrical loading across all anchor points, leaving residual stresses that compromised long-term stability.
Our Custom-Engineered Solution
YIFEX engineered a fully synchronized multi-station hydraulic tensioning system specifically for large-scale foundation applications. The solution included extra-long, high-strength hydraulic tensioners and a centralized digital control console. Our engineers developed a Thermal Compensation Tensioning Protocol, calculating precise target loads that accounted for operational temperature changes. We conducted on-site supervision for the first re-tensioning project, training the plant’s maintenance team on the procedure.
The Measurable Results
Eliminated Turbine-Generator Misalignment, with post-maintenance alignment checks showing zero deviation after multiple thermal cycles.
Vibration Levels Reduced by 70% to well within optimal specifications, indicating perfect joint integrity and load distribution.
Foundation Re-Tensioning Time Cut by 50%, minimizing critical outage window duration.
Established a Predictive Maintenance Baseline with documented “as-found” and “as-left” load data for every anchor bolt, enabling future condition monitoring.
Customer Testimonial
“The stability of our turbine-generator set is the bedrock of our plant’s reliability. Yifex’s synchronized foundation bolting system didn’t just fix our alignment issue—it provided a data-driven, repeatable process that gives us absolute confidence in the integrity of this critical asset for years to come.”
— Chief Maintenance Engineer, Rhein Energie Kraftwerk
Back
Related Products

Customize Your Solution

CONTACT US

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*

SEND MESSAGEGET IN TOUCH

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*
HomeProductsAbout UsContact