Yifex Industry Co.,Limited

OUR PROJECTS

OUR PROJECTS
Home Project Infrastructure

Mega-Airport Terminal Roof Bolting – Synchronized Tensioning for Large-Span Steel Structure Assembly

January/19/2026
The Business & Technical Challenge
Business Pain Point: The construction of a new international airport terminal was on a fixed deadline tied to a national infrastructure plan. The assembly of the expansive, geometrically complex roof structure was the critical path. Any delay in bolting the massive prefabricated steel nodes, or any future joint integrity issue, risked postponing the entire airport opening, incurring massive contractual penalties and national reputational damage.
Technical Challenge: Connecting the enormous, cantilevered roof trusses required the simultaneous tensioning of dozens of high-strength, large-diameter bolts at each node. Traditional sequential bolting methods risked inducing uneven stress and deformation into the delicate structure during assembly, potentially leading to misalignment. The sheer scale and precision required made consistent, verifiable preload across every bolt non-negotiable for long-term structural safety.
Our Custom-Engineered Solution
YIFEX deployed a scalable synchronized hydraulic tensioning system that could be configured for various node geometries throughout the roof. We supplied custom-engineered hydraulic nuts and load pins with wireless transmitters, integrated into a real-time digital monitoring platform. This allowed the site engineers to visualize and verify the exact load distribution across every bolt in a node as tensioning occurred, ensuring perfect balance and eliminating guesswork. Our team provided on-site procedure validation and certified training for the steel erector’s crew.
The Measurable Results
100% Node Assembly Success with zero rework due to stress-induced deformation or misalignment, keeping the project perfectly on schedule.
35% Faster Erection Time for major roof sections, directly accelerating the critical path.
Complete Digital “As-Built” Load Record for every structural connection, providing an invaluable asset for future maintenance and structural health monitoring.
Project Delivered for On-Time Inauguration, with the bolting methodology praised for its precision, safety, and contribution to flawless execution.
Customer Testimonial
“Building the roof of a landmark terminal is like assembling a giant, precision watch at scale. The margin for error in the bolting was zero. YIFEX’s synchronized system and live data monitoring didn’t just fasten bolts—they gave us a real-time engineering assurance that every connection was perfect before we moved on.”
— Lead Structural Project Manager, Global Airport Infrastructure Group

Back
Related Products

Customize Your Solution

CONTACT US

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*

SEND MESSAGEGET IN TOUCH

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*
HomeProductsAbout UsContact