The Business & Technical Challenge

Business Pain Point: For a Floating Production, Storage and Offloading (FPSO) vessel operating in a deep-water field, the integrity of the mooring system is paramount. The massive bolts securing the chain stoppers—which hold the entire vessel against ocean currents and weather—began showing signs of preload loss. This presented an existential risk: a single failure could lead to catastrophic mooring line disconnect, potentially causing vessel drift, pipeline rupture, and environmental disaster, with liabilities in the hundreds of millions.

Technical Challenge: The chain stopper assemblies are subjected to immense, unpredictable dynamic loads. Achieving and maintaining perfectly uniform preload across clusters of extra-large, high-grade bolts in a saline, corrosive splash zone is exceptionally difficult. Traditional methods could not provide the simultaneous tensioning or verifiable data needed to ensure every bolt shared the load equally, creating weak points vulnerable to fatigue and stress corrosion cracking.

Our Custom-Engineered Solution
YIFEX engineered a marine-certified, synchronized hydraulic tensioning system utilizing super-duplex stainless steel hydraulic nuts for unmatched corrosion resistance. The solution included wireless load verification technology to record the exact preload on each bolt during installation without impeding access. Our team executed the critical retrofit during a tight operational window, providing 24/7 on-vessel supervision and handing over a detailed Digital Twin Load Report of the entire mooring system for future monitoring.
The Measurable Results
Guaranteed Load Uniformity of 98.5% across all critical chain stopper bolts, eliminating single-point overload risks.
Successfully Certified for Continuous Operation in the harsh offshore environment, with zero remedial actions required post-installation.
Retrofit Completed Within Planned Shutdown Window, avoiding costly extensions to production downtime.
Future-Proofed Asset Integrity with a benchmarked digital load record, enabling predictive maintenance and vastly simplifying regulatory compliance audits.
Customer Testimonial
“The bolts holding our mooring system are quite literally what keep us safe and in place. The margin for error is zero. YIFEX didn’t just supply tools; they delivered a certified engineering process with full traceability. The data they provided gives us peace of mind for the lifetime of the field.”
— Offshore Installation Manager, Nordic Deepwater Solutions AS
Back
Related Products

Customize Your Solution

CONTACT US

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*

SEND MESSAGEGET IN TOUCH

Name*
E-mail*
Country*
Phone/WhatsApp*
Message*
HomeProductsAbout UsContact